Tuesday, August 10, 2010

WORKIN' ON A CHAIN GANG

Ditch number 1. This is the four foot deep ditch that was required for the electrical line. It was rocky digging. Thank goodness for the excavator and his backhoe. Now Gareld has to lay in conduit then OTE will come and put in the pole and wire. Who knew there would be so many things to do before you can even think about moving out here.
Here's some of Gary's handiwork. He has been standing and tamping the poles in by himself. It's heavy work and he does a couple at a time. Trying to hold them in place and get them level and straight is tough. I told him to ask for help (from someone besides me)...so far it's been all him.

Ditch number 2. The ground here was a lot easier to dig in and there is a gradual decline from the shop to the pipe. The will be the sewer line for the bathroom in Gareld's shop.


No comments:

Post a Comment