We're going to need electricity soon. There is a lot of preparation to complete before OTE comes out to do their part. Besides digging a ditch through "rocky bottom" Gareld had to lay the pipe and cover it with dirt. May sound easy but finding just "dirt" took some doing. This week he put in the box. We are getting closer.
We don't have enough rocks on the place already so we had 4 truckloads hauled in. The property is a bit hilly so Gareld is filling in the shop floor before the concrete is poured...something about not wanting a slope in the floor? :)